AWS CWI/SCWI Part C – API 1104 Code Endorsement Exam

Q:- When pipe is welded above ground, the working clearance around the pipe at the weld should be at least:

Posted on


A. 12 inches 

B. 16 inches 

C. 20 inches 

D. 24 inches 

E. 30 inches

Advertisements